DURABILITY
|
Operation life |
Measurement shall be made following the test set forth below: DC 12V, 50 mA resistance load; Rate of operation:40-60 times/min; Operating Force:320~350gf; Average fault-free life: 100,000 cycles |
Contact resistance: ≤200mΩ Contact bounce: ≤10ms Operating Force: initial value±30% |
2 |
Vibration |
Measurement shall be made following the test set forth below: 1) Vibration frequency range: 10Hz to 55Hz to 10Hz; 2) Amplitude: 1.5mm; 3) Direction of vibration: three mutually perpendicular direction including the direction of stem travel 4) Duration: Each 2hours. |
|
3 |
Operation |
The switch is placed perpendicular to the direction of the operation, gradually force in key top center of switch, measure maximum intensity when it conducted required. |
260±50gf |
4 |
Over Travel |
Switch at the vertical operating orientation placement, with a force equal to 2 times according to the static load applied on the switch button the top center, measure the top moving distance |
0.25±0.10mm |
5 |
Return force |
The sample switch is installed such that the direction of switch operation is vertical and upon depressing the stem in its center to the whole travel distance, the force of the stem to return to its free position shall be measured. |
60gf.min. |
6 |
Stop strength |
Placing the switch such that the direction of switch operation is vertical, and then a static load of 30N shall be applied in the direction of stem operation for a period of 1 min. |
There shall be mechanically |
7 |
Stem strength |
Placing the switch such that the direction of switch operation is vertical, and then the maximum force to withstand a pull applied opposite to the direction of stem operation shall be measured. |
20N.min. |
DRAWING & DIMENSION:
Our Service
More Professional service in Packaging and printing products exporting field
2.Better manufacture ability
3.Various payment term to choose:T/T,Western Union,L/C,Paypal
4.High quality/Safe material/Competitive price
5.Small order available
6.Quickly response
7.More safe and fast transport
8.OEM design for all customers
Remarks
PARTS LIST:
NO. |
NO. |
NAME |
MATERIAL |
1 |
1 |
TERMINAL |
Brass Silver plating |
2 |
1 |
CASE |
PA66 |
3 |
1 |
CONTACT |
SUS301 Contact side silver plating |
4 |
1 |
STEM |
PA66 |
5 |
1 |
LED |
GaP |
Returned plastic should not exceed 20%.
FAQ
Q: What's the trade term and payment term?
A:Amount less than $1000, 100% paid before production, more than $1000 can be negotiated!T/T, Western Union, PAYPAL etc.
Q:What is your terms of delivery?
A:We accept EXW, FOB, CFR, CIF, etc. You can choose the one which is the most convenient or cost effective for you.
Q: What’s your MOQ?
A: If we have the products in stock, it will be no MOQ. If we need to produce, we can discuss the MOQ according to customer’s exact situation.
Q:What about the lead time for mass production?
A:15-20 working days for mass production.It depends on your quantity,and we will try our best to meet your needs.
http://www.switech-china.com/